Quantcast
Channel: High Availability (Clustering) forum
Viewing all articles
Browse latest Browse all 5654

VMs causes physical switch overload

$
0
0
After installing Failover Cluster Manager on a Server 2012R2, when a VM is started using a virtual switch connection to a Cisco 3750, the physical switch gets overwhelmed with high CPU usage and won't stop until the switch is power cycled. When I did the same thing in Hyper-V before I enabled the FCM feature everything worked okay. But high availability is the goal. What is going on with the interaction of FCM and the physical infrastructure.

Viewing all articles
Browse latest Browse all 5654

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>