Howdy
We have way more capacity in our Hyper-V cluster than we currently use. We do patching via CAU and it takes a very long time. We have 6 nodes and since it goes one by one, each machine takes time to migrate off, time to install the patches, time
to reboot, and time to make sure everything went OK. This can end up being 30-60 minutes per server.
I'd love to be able to tell CAU to clear off 2 nodes at once and go through the steps as I'd then get done almost twice as fast but didn't know if there's any way to do that.
Thanks