Here is the scenario:
Legacy Host: Windows 2008 R2
Guest VM: Windows 2008 R2 with Exchange 2013 SP1 DAG cluster.
After importing the VM (2008 R2 and Exchange 2013 DAG) into a 2012 R2 host (Cluster). (copy VM files to new 2012 R2host) Everything works fine.
Then upgrading "Installation Services" (for Windows 2012 R2 host) on the imported VM runs fine with no errors to the "Restart" prompt. VM than shows: "Configuring Windows updates 32% complete. Do not turn of your computer." Hangs there for about 20 minutes until is says "shutting down". Hangs there for 20 minutes until power off. Restart to normal start; "Preparing to configure Windows. Do not turnoff your computer." proceeds slowly to "Configuring Windows updates 32% complete. Do not turn of your computer." hangs there again indefinite. Sometime hangs at shutdown cycle and "Configuring Windows updates 32% complete. Do not turn of your computer." indefinitely.
I moved 20 other machines from a 2008 R2 host to new Windows 2012 R2 hosts all of these machines install the 2012 R2 Integration services just fine on the 2008 R2 VM. Just the 2008 R2 VMs clustered (DAG) and Exchange 2013 SP1 do not take the Integration
Services upgrade.
Any advise from Microsoft? I know I could decommission the DAG and Exchange machines and install Integration services on the native box before Exchange and DAG and that would sure work, but I'd rather avoid that amount of work for a simple integration layer
upgrade.
Thanks
Gerhard Waterkamp ACSLA Inc.